Categories
- Glenmar Road Building Renovations (18)
- New Cut Road (15)
- New Cut Road Building Progress (84)
- Pastors Ponderings (17)
- Phase 2 Info (14)
- Realignment of New Cut Road Progress (9)
- Staff News (4)
- Uncategorized (7)
Latest Postings
- October 31, 2009: Looking Good!
- October 16, 2009: Lots of Progress
- September 19, 2009: Starting The Roof
- August 15, 2009: More Walls
- August 7, 2009: Putting In The Walls
- August 1, 2009: Church-Wide Sabbath
- July 28, 2009: More On The Second Floor
- July 19, 2009: Howard County Bond Hearing
- July 11, 2009: 2nd Level Floor Starting
- July 11, 2009: Community Meeting with State Highway Admin
Links
Floor Plans
Other Stuff
Prayer Life
Web Sites
Archives
« Todays Work | Web Cam Update »
Concrete, Rebar, and an Amphitheater
The lower level of the Multipurpose Building keeps rolling along. Al took these photos today and you can almost visualize the building! (Ok, you may have to use your imagination a lot…) Here is the outside of the south wall. This wall will be underground and will get dirt back-filled against it.

Here is the view of the south wall from down in “Youth World”.

This photo is neat (in a nerd-geek-engineer sort of way) as it is the beginnings of the amphitheater/stairway that will go from the upper parking lot down to the lower level. This is going to be a real neat place when it is warm to have outside worship or music or, whatever…

Is this stuff exciting or what?