- November 7, 2008: Staff Trailer
- October 1, 2008: Tough Choices
- September 25, 2008: Changes.
- July 14, 2008: More Photos
- July 14, 2008: Procession Photos
- July 13, 2008: Glorious Day!
- July 9, 2008: Moving Day Ponderings
- June 30, 2008: July 13th is Moving Day!
- June 25, 2008: News From New Cut
- June 21, 2008: God's Schedule, Not Ours
Floor Plans
Other Stuff
Prayer Life
Web Sites
Author Archive
Staff Trailer
November 7, 2008 by Larry Resch.
The trailer for the staff offices is in place about where the chapel will be situated. Having the trailer will let the staff get back to having their own desk, phone, and computer instead of sharing space wherever they can find it in the Phase 1 building. Before the staff can move in, we are waiting on power, phones, and network wiring to be run to the trailer. (Hopefully they will be in there by Thanksgiving, but don’t hold me to it!)
On October 13th, the footers were in place…

The trailer was in place two weeks later…

And here is a view from the back hill by New Cut Road looking at the Spirit Center…

Posted in Phase 2 Info, New Cut Road, New Cut Road Building Progress | No Comments »
More Photos
July 14, 2008 by Larry Resch.
Here are photos taken by Connie Ballenger.

Pastor Andy Lunt and the cross before leaving the Glen Mar site.

The procession also included drums and a bagpipe. Below are some more photos from the procession.




Pastor John Nupp outside the Spirit Center doors looking happy. (Or was it relieved?)
Posted in New Cut Road | No Comments »
Procession Photos
July 14, 2008 by Larry Resch.
Scott Johnson has taken some great shots of the procession on the 13th. A link to all of his shots can be found here. Below are some of the photos.

Here is the cross waiting to lead off the procession.

The cornerstone from the original church is removed and was part of the procession to the new site.

The procession down Route 104 was lead by the cross and followed by this banner.

Another shot of the procession. It is said that we had 300 people in the procession!

The cross is being put in a stand at the new site until it is mounted to the wall.
Praise God!
Posted in New Cut Road | No Comments »
July 13th is Moving Day!
June 30, 2008 by Larry Resch.
We will be moving from our current site on Glen Mar Road to our new site on New Cut Road on July 13th, 2008. On this Sunday, we will have a Service of Leave Taking at 9:15 am at the Glen Mar Road site (in the Sanctuary). At 10:00, we will have a procession and carry the cross from the old site to the New Cut Road site along Route 104. At 11:00, we will celebrate the opening of the new site with a Service of Praise for God.
Starting on the 20th, we will start our new schedule of worship for the New Cut Road site. Check out the home page (www.glenmarumc.org) for more details.
Posted in New Cut Road Building Progress | No Comments »
Phase 2 Floor Plans Updated
June 2, 2008 by Larry Resch.
The floor plans for the Education Wing (aka Phase 2) have been updated. The new floor plans reflect the latest design to minimize construction costs and schedule. They can be accessed via the side links or from
Posted in New Cut Road Building Progress | No Comments »